PFP is a component of fire protection and safety strategy in which is desdigned to be built into a structure of the building.
It minimizes casualties and economic loss by containing and delaying fire and smoke to be spread and also by supporting the structure so it will not collapse.
Samwon Techno has established PFP department and operated since 2010. Not only strictly complying with related regulations and stanadards such as ISO 9001, 140001,
SSPC-QP6, and etc. but also having best applicators with prudent experiences and optimal euqiments that can be used in any circumstances with finest performances.
Our advantages are at ocean plant structures and we have worked with preeminent corporations like BP, Exxonmobil, ENI, and Chevron.
PFP procedures 01
1st Coating
Spray PFP paint on the surface of the structure
Make the surface smooth and even by using scrapper and roller
PFP procedures 02
Install Mesh
Cut Mesh to required size before starting roll the mest into wet chart
STEP 03
Final coating
Put on PFP paint again on the surface over mesh using spray, scrapper and roller.
STEP 04
Inspection
Check if there is any defects(pinholes, voids) on the surface
Mesh : Mesh is a net that prevents PFP paints falling off from the substrate.
PFP(Passive Fire Protection)에 대한 추가설명 및 이미지를 삽입할 수 있는 공간입니다. 내용을 보내주시면 적용을 도와드리겠습니다.